2 Opening(s)
2.0 Year(s) To 8.0 Year(s)
2.50 LPA TO 5.00 LPA
A Production Panel Production Engineer's job description focuses on optimizing the assembly and testing of electrical control panels, ensuring efficient production, quality, and compliance with safety standards. They work with production teams, design engineers, and quality control to streamline processes, troubleshoot issues, and implement improvements to enhance panel manufacturing.
Key Responsibilities:
Production Process Optimization:
Analyze ...
1 Opening(s)
3.0 Year(s) To 8.0 Year(s)
4.00 LPA TO 6.00 LPA
Qualification
B.Sc. / M.Sc. in Chemistry or B.Sc. with Chemistry as a major subject.
Candidates with relevant experience in chemical processing, surface treatment, phosphating or pickling operations will be preferred.
Experience
3 to 8 years of relevant experience in:
Phosphating Plant
Pickling Plant
Surface Treatment Plant
Tube Manufacturing
Steel / Engineering Manufacturing
Chemical Processing Industry
Key Responsibilities
Manage and supervise the complete ...
10 Opening(s)
0 To 2.0 Year(s)
Not Disclosed by Recruiter
Actively participate in all training modules and workshops, demonstrating a proactive approach to learning.
Assist senior engineers and managers in analysing production data, preparing technical reports, conducting quality checks, supporting system testing, assisting with equipment maintenance].
Shadow experienced professionals to understand operational procedures, best practices, and decision-making processes.
Contribute to assigned projects, from ...
2 Opening(s)
2.0 Year(s) To 5.0 Year(s)
3.00 LPA TO 6.00 LPA
Qualifications:
Education: Bachelor’s Degree in Mechanical Engineering, Mechatronics, or a related field.
Experience: 2+ years of experience in mechanical design, with a focus on jigs, fixtures, SPM, machined parts, and material handling equipment.
Duties & responsibilities:
Design & Development:
Design jigs, fixtures, special purpose machines (SPM), machined components, and material handling devices according to client specifications.
Develop pneumatic and ...
3 Opening(s)
5.0 Year(s) To 15.0 Year(s)
Not Disclosed by Recruiter
Responsibilities
Project Ownership: Manage the full project lifecycle—from inception to site closure and final payment collection.
Customer Interaction: Serve as the single point of contact for customers, ensuring clarity, responsiveness, and professional relationship management.
Contract Management: Review and interpret technical specifications, contractual obligations, and scope of work.
Planning & Execution: Develop project schedules, risk ...